What is the primary objective of a layout strategy?
View answer and explanationWhich type of layout is designed to deal with low-volume, high-variety production?
View answer and explanationAccording to the text, what is the main objective of a retail layout?
View answer and explanationWhat are fees that manufacturers pay to retailers to get their goods on the shelf called?
View answer and explanationThe physical surroundings in which a service is delivered and how they affect customers and employees is known as what?
View answer and explanationWhat is the primary objective of a warehouse layout?
View answer and explanationA process-oriented layout for the Walters Company involves six departments, each 20x20 feet, in a building that is 60 feet long and 40 feet wide. If moving a load between adjacent departments costs 1 dollar and between nonadjacent departments costs 2 dollars, what is the cost for a flow of 100 loads per week between the Assembly department and the Machine Shop department if they are nonadjacent?
View answer and explanationWhat is the term for a layout that addresses the requirements of large, bulky projects like ships and buildings, where the product remains stationary?
View answer and explanationA work cell for producing auto mirrors is scheduled for an 8-hour day and is expected to deliver 600 mirrors daily. What is the takt time for this work cell?
View answer and explanationAn assembly line for a wing component has a total task time of 65 minutes. If the daily production schedule requires 40 units and there are 480 productive minutes of work available per day, what is the theoretical minimum number of workstations?
View answer and explanationWhich layout strategy arranges machinery and equipment to focus on the production of a single product or a group of related products?
View answer and explanationThe practice of avoiding placing materials in storage by processing them as they are received is known as:
View answer and explanationAn assembly line is balanced with 6 workstations. The total task time to produce one unit is 65 minutes, and the largest assigned cycle time is 12 minutes. What is the efficiency of this line balance?
View answer and explanationWhich of these is NOT one of the three factors that complicate a fixed-position layout?
View answer and explanationWhat is the main distinction of an office layout compared to other layout types?
View answer and explanationA useful tool for office layout analysis that indicates the relative importance of having different departments or personnel near each other is called a:
View answer and explanationIn a retail supermarket layout, where are high-draw items like dairy and bread typically located?
View answer and explanationWhat is a focused work center?
View answer and explanationIn assembly-line balancing, what is the term for the maximum time that a product is allowed at each workstation?
View answer and explanationWhich of the following is NOT an advantage of a work cell layout?
View answer and explanationWhich of the following is a key requirement for a warehouse to successfully use a random stocking system?
View answer and explanationWhich of the following is an advantage of a product-oriented layout?
View answer and explanationA hotel housekeeper, Alison Harvey, was observed to have an average time of 1.7 minutes to vacuum a floor, with a performance rating of 120 percent. The hotel uses a 10 percent allowance factor. What is the standard time for vacuuming a floor?
View answer and explanationIn the context of servicescapes, what do 'signs, symbols, and artifacts' refer to?
View answer and explanationWhat are the two requirements for successful cross-docking?
View answer and explanationWhat is the primary reason Canon's copier factories in Japan switched from assembly lines to work cells?
View answer and explanationA work cell must produce one unit every 48 seconds to meet customer demand (takt time). The total operation time required to produce one unit is 140 seconds. How many workers are required for the cell?
View answer and explanationWhat are the two types of product-oriented layouts mentioned in the text?
View answer and explanationWhat does a precedence diagram illustrate in the context of assembly-line balancing?
View answer and explanationWhich of these is NOT one of the five layout heuristics used to assign tasks to workstations in assembly-line balancing?
View answer and explanationA problem with a process-oriented layout is that it often has high work-in-process inventories. Why does this occur?
View answer and explanationWhat is the primary trade-off addressed by a warehouse layout?
View answer and explanationWhat layout is McDonald's implementing in its redesigned restaurants, featuring 'linger', 'grab and go', and 'flexible' zones?
View answer and explanationFor a production process that requires 40 units per day and has 480 minutes of productive time available, what is the cycle time?
View answer and explanationWhich of the following would NOT be considered an 'ambient condition' in a servicescape?
View answer and explanationOne of the first steps in designing a process-oriented layout for Walters Company was to construct a matrix showing the flow of parts between departments. What is this matrix called?
View answer and explanationWhat is a major disadvantage of a process-oriented layout?
View answer and explanationThe objective of assembly-line balancing is to:
View answer and explanationAccording to the text, which layout strategy positions workers, their equipment, and spaces/offices to provide for movement of information?
View answer and explanationA U-shaped layout is often used in which type of layout strategy to reduce movement and enhance communication?
View answer and explanationIn the Walters Company example, after switching departments 1 and 2, the total material handling cost was reduced from 570 dollars to what amount?
View answer and explanationWhat is the key difference between a fabrication line and an assembly line?
View answer and explanationWhat does a work balance chart, like the one used for the mirror production work cell, illustrate?
View answer and explanationWhich of the following is NOT one of the seven layout strategies discussed in the chapter?
View answer and explanationThe concept of 'hoteling' in an office layout, as used by Deloitte & Touche, is a response to what trend?
View answer and explanationWhat is the primary benefit of using a 'from-to matrix' in designing a process-oriented layout?
View answer and explanationIn the Boeing wing component example, what does it mean that Task B must follow Task A?
View answer and explanationWhen are fixed-position layouts appropriate?
View answer and explanationWhich of these is NOT a good practice for retail layout arrangement?
View answer and explanationWhat is the total idle time per cycle for the six-station assembly line solution shown in the text, which has a cycle time of 12 minutes and a total task time of 65 minutes?